College Place

Total Costs $1,217,000 – OEPA/WPCLF 0% loan funding – Work performed Summer 2018

College Place Improvements included reconstruction of the existing roadway from Clinton Street to Webster Street. Improvements include: new sidewalks on the north side, new shared use path with lighting along the south side, a reduction in the roadway width to two 10’ lanes, and the installation of an 8’ tree lawn between the roadway and the shared use path for green infrastructure placement.